14. Lead Length, Loop Area & Inductance · Page 4 of 5
Strategy for Long Feeders
When the load is far from the board SPD.

Problem
A Type 2 at the SDB may not protect a rooftop inverter 80 m away from locally induced surges on that feeder.
Solution
Add a local SPD near the remote equipment / local isolator, coordinated with upstream devices.
PV example
Protect both DC array entries and AC inverter outputs at the equipment location.
